Name: | Pile Breaker | Max Pile Diameter: | 1200mm |
---|---|---|---|
Max Drill Rod Pressure: | 485kN | Max Stroke Of Cylinder: | 150mm |
Max Flow Of Single Cylinder: | 31.5L/min | Max Cut Number Of Pile: | 60/8h |
Height Of Cutting Each Time: | ≦300mm | Module Numbers: | 8 |
Diameter: | 1050-1200 | After-sales Service Provided: | Video Technical Support, Online Support |
Highlight: | 1000mm diameter hydraulic pile breaker,round foundation hydraulic pile breaker,1000mm diameter hydraulic pile breaking machine |
1000mm Diameter Piles Breaking Machine for Round Foundation Piles
SPA5 hydraulic pile breaker machine is a kind of construction machinery suitable for quickly cutting off pile heads in pile foundation engineering. It is suitable for cutting pile heads of various types of pile foundations, such as cast-in-place piles, prefabricated piles, etc. According to the shape of the pile head, it can be divided into round pile breaker machine and square pile breaker machine. Pile breaker machines are widely used in high-speed railway bridges and industrial and civil construction pile foundation projects. Generally, round pile breaker machines are suitable for pile diameters of 200mm-2200mm; square pile breakers are suitable for pile side lengths of 300-650mm, which can meet various requirements for large-scale foundation construction.
SPA5 Construction’s Parameters
Module numbers | The diameter range (mm) | Platform weight(t) | Total pile breaker weight(kg) | Height of single crush pile(mm) |
7 | 250-450 | 12 | 1470 | 300 |
8 | 400-600 | 13 | 1680 | 300 |
9 | 550-750 | 15 | 1890 | 300 |
10 | 700-9000 | 18 | 2100 | 300 |
11 | 900-1050 | 21 | 2310 | 300 |
12 | 1050-1200 | 26 | 2520 | 300 |
Specification (a group of 12 modules)
Model | SPA5 |
Range of Pile diameter (mm) | Ф1050-Ф1200 |
Maximum Drill rod pressure | 485kN |
Maximum stroke of hydraulic cylinder | 150mm |
Maximum pressure of hydraulic cylinder | 31.5MPa |
Maximum flow of single cylinder | 25L/min |
Cut the number of pile/8h | 60 |
Height for cutting pile each time | ≦ 300mm |
Supporting the digging machine Tonnage (excavator) |
≧ 20t
|
One-piece module weight | 210kg |
One-piece module size | 895x 715 x 400mm |
Work status dimensions | Ф2670x 400 |
Total pile breaker weight | 2.5t |
Introduction
The hydraulic pile breaker is also called the hydraulic pile cutter. The construction of modern buildings requires foundation piling. In order to better connect the foundation piles with the ground concrete structure, the foundation piles generally extend out of the ground by 1 to 2 meters, so that the steel bars are completely preserved. On the ground, artificial air pick crushers are generally used for crushing, which is not only slow in efficiency but also high in cost.
Through continuous research and development experiments by Sinovogroup, the brand-new SPA series hydraulic pile breaker has been launched. The SPA series hydraulic pile breaker provides pressure to multiple oil cylinders of the pile breaker through the power source. Pile head cut off. During the construction of the pile breaker, the hydraulic pile breaker has the advantages of simple operation, high construction efficiency, low noise and low cost, and is suitable for pile group construction projects. SPA series hydraulic pile breaker adopts a highly modular combination. Through the pin-shaft connection module, it can be combined with different modules to cut off the diameter of the pile head within a certain range, including the square pile and the round pile.
Construction steps
1. According to the construction pile diameter, refer to the construction reference parameter table to combine the corresponding number of modules, and directly connect the pile cutter to the working platform through the quick-change joint;
2. Move the pile cutter to the working pile head cutting pile;
3. Adjust the height of the pile cutter to the appropriate pile cutting position, and clamp the pile surface to be cut;
4. Adjust the system pressure of the excavator according to the strength of the concrete poured into the pile, and pressurize the oil cylinder until the concrete pile body breaks under strong pressure;
5. After the pile body is cut off, the concrete block is lifted directly by the lifting force of the platform;
6. Move the pile to the designated location.